The District, located in the Mall of Oviedo, is a one of a kind family entertainment center designed with fun times in mind for adults and children alike. The project encompasses more than 23,000 sq. ft. tenant area including bowling alleys, escape rooms, food preparation and dining areas, retail, game zone and party spaces. TAGS Engineering provided mechanical, plumbing, and fire protection solutions for the job. The building renovation design included more than 85 tons of cooling, a new 2,500 gallon grease interceptor and modification of existing fire protection sprinkler system. Technical challenges on the job included converting an existing retail space into a full-service kitchen and meeting fresh air requirements for high occupancy rates while reusing the existing equipment.